A LORRY has shed its load of glass panes causing long delays on the M25.

The A282 southbound between junction 1B and junction 2 with the M25 clockwise at the Darenth Interchange.

A lorry has shed its load of panes of glass across lanes one and two of the main carriageway and J2 exit slip road.

Traffic is unable to access J2 roundabout (Darenth Interchange), motorists can still use the link road from the M25 to the A2 eastbound.

Drivers are advised to allow extra time for travel.